farmsolarpanels Solar for farm buildings, UK wide Book a roof survey

Solar panels for farms in Newton Aycliffe

Around Newton Aycliffe the constraint is rarely the roof. It is the incoming supply and what the network will accept back. The survey starts on the covering: fibre cement or steel, its remaining life, the purlin spacing and what the frame will carry.

819 kWh per kWp a year at this latitude, so a 500 kWp array models at about 410,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Newton Aycliffe
96 m phase 1
Drawing Newton Aycliffe unit
Roof 96 x 62 m
Array 500 kWp
Yield 410,000 kWh/yr
Scale 1:500 / Rev A / DL5

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Newton Aycliffe / County Durham
North East farmland with solar arrays on farm buildings
Industrial stock of the kind we survey across North East.

Solar for agricultural buildings across County Durham

What a farm roof near Newton Aycliffe generates

Modelled irradiation at this latitude is 1045 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 819 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is about 8 percent below the mean across the areas we cover, so the case here rests on using the output on the holding rather than exporting it.

The planning record lists 2 ground mounted solar schemes in this postcode district, which is a fair guide to how the local network has treated field arrays. The typical consented scheme in this district is about 2.6 MW, with the largest at 5 MW. Source: Renewable Energy Planning Database, Q1 2026.

3 roof mounted schemes are on record nearby. Roof arrays under a megawatt frequently never reach that database at all, so the real number of farm roofs generating around Newton Aycliffe is higher than the record shows.

Surveys run across DL postcodes, DL5 outward.

Darlington is the planning authority for most holdings here, and it is the authority that decides whether an array on an agricultural building falls inside permitted development.

FIG. 1 What a Newton Aycliffe roof makes, month by month

What a Newton Aycliffe roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

0255075100Jan: 19 kWh per kWpJanFeb: 34 kWh per kWpFebMar: 67 kWh per kWpMarApr: 98 kWh per kWpAprMay: 117 kWh per kWpMay117 kWh Jun: 111 kWh per kWpJunJul: 116 kWh per kWpJulAug: 99 kWh per kWpAugSep: 74 kWh per kWpSepOct: 44 kWh per kWpOctNov: 25 kWh per kWpNovDec: 15 kWh per kWpDec

May produces 7.8 times what Dec does on the same roof. A 500 kWp array here models at about 410,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan199,500
Feb3417,000
Mar6733,500
Apr9849,000
May11758,500
Jun11155,500
Jul11658,000
Aug9949,500
Sep7437,000
Oct4422,000
Nov2512,500
Dec157,500
Source: EU PVGIS v5.2
FIG. 2 Newton Aycliffe against the rest of County Durham
  • Peterlee845
  • Durham823
  • Chester-le-Street821
  • Newton Aycliffe819
  • Bishop Auckland817
  • Consett811

Newton Aycliffe ranks 4 of 6 towns we cover in County Durham on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 811 to 845, a spread of 34 kWh per kWp. Within County Durham that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Grid connection through Northern Powergrid

Connections around Newton Aycliffe are handled by Northern Powergrid, which sets the export limit for the site. Above 3.68 kW per phase the connection runs under G99, so the export limit is agreed in advance rather than assumed. Where the local network is constrained, an export-limited connection usually still makes the scheme work, because a farm uses most of what the roof makes during the working day.

Across County Durham the planning database records 85 solar schemes totalling 1168 MW, of which 9 are operational (REPD Q1 2026).

Solar already consented near DL5

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Field at School Aycliffe Lane Lightsource Renewable Energy 5 MW Ground Operational
York Road - Solar PV panels Durham County Council 0.15 MW Roof Awaiting Construction
Horndale Avenue - Solar PV System Private Developer 0.25 MW Ground Application Withdrawn
Roman Factory, Whitworth Avenue - Solar PV Panels Roman Limited 0.2 MW Roof Awaiting Construction
Coherent, Millennium Way - Solar Panels Coherent n/a Roof Awaiting Construction
Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Newton Aycliffe

How much does a farm roof near Newton Aycliffe generate?
The model gives 819 kWh for every kWp installed here, so 500 kWp comes out at about 410,000 kWh a year before shading losses. A building of roughly 1,485 sqm of clear roof carries it. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Will the rural network around Newton Aycliffe take the export?
Northern Powergrid is the distribution network operator for County Durham. Anything above 3.68 kW per phase connects under G99, and the application sets the export limit. Rural supplies are often the binding constraint, so we ask the question before an array is sized.
Is planning permission needed for panels on a farm building near Newton Aycliffe?
Usually permitted development covers a roof array. Ground mounted arrays are a different question and are far more likely to need a full application. We put both to Darlington before design sign-off.
Has anyone near DL5 already done this?
The planning database records 2 ground mounted and 3 roof mounted solar schemes in this postcode district. That matters less as proof it works and more as evidence of how the local network has treated export applications. Roof arrays under a megawatt often never appear in the database, so the real figure is higher. Source: Renewable Energy Planning Database, Q1 2026.

Nearby