Solar panels for farms in Nantwich

Farm buildings around Nantwich carry broad, shallow roofs that were put up for storage and stock, not for generation. Each survey records the sheet type and condition, the usable area once rooflights and vents come out, and whether the supply is single or three phase.

840 kWh per kWp a year at this latitude, so a 500 kWp array models at about 420,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Nantwich
96 m phase 1
Drawing Nantwich unit
Roof 96 x 62 m
Array 500 kWp
Yield 420,000 kWh/yr
Scale 1:500 / Rev A / CW5

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Nantwich / Cheshire
Farmland in the North West with solar arrays on farm building roofs
Industrial stock of the kind we survey across North West.

Farm building solar PV across Cheshire

What a farm roof near Nantwich generates

Modelled irradiation at this latitude is 1077 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 840 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is about 5 percent below the mean across the areas we cover, so the case here rests on using the output on the holding rather than exporting it.

The planning record lists 4 ground mounted solar schemes in this postcode district, which is a fair guide to how the local network has treated field arrays. The typical consented scheme in this district is about 6.7 MW, with the largest at 12.5 MW. Source: Renewable Energy Planning Database, Q1 2026.

2 roof mounted schemes are on record nearby. Roof arrays under a megawatt frequently never reach that database at all, so the real number of farm roofs generating around Nantwich is higher than the record shows.

We survey holdings across the CW postcode area, starting from CW5.

Cheshire East is the planning authority for most holdings here, and it is the authority that decides whether an array on an agricultural building falls inside permitted development.

FIG. 1 What a Nantwich roof makes, month by month

What a Nantwich roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

0255075100Jan: 20 kWh per kWpJanFeb: 36 kWh per kWpFebMar: 69 kWh per kWpMarApr: 100 kWh per kWpAprMay: 117 kWh per kWpMay117 kWh Jun: 117 kWh per kWpJunJul: 116 kWh per kWpJulAug: 99 kWh per kWpAugSep: 76 kWh per kWpSepOct: 46 kWh per kWpOctNov: 26 kWh per kWpNovDec: 18 kWh per kWpDec

May produces 6.5 times what Dec does on the same roof. A 500 kWp array here models at about 420,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2010,000
Feb3618,000
Mar6934,500
Apr10050,000
May11758,500
Jun11758,500
Jul11658,000
Aug9949,500
Sep7638,000
Oct4623,000
Nov2613,000
Dec189,000
Source: EU PVGIS v5.2
FIG. 2 Nantwich against the rest of Cheshire
  • Nantwich840
  • Chester836
  • Crewe835
  • Ellesmere Port835
  • Northwich832
  • Warrington828
  • Wilmslow801
  • Macclesfield790

Nantwich ranks 1 of 8 towns we cover in Cheshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 790 to 840, a spread of 50 kWh per kWp. On a 500 kWp array that is about 25,000 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Solar already consented near CW5

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Hatherton Lodge Green Switch Solutions - Liquidated 8.3 MW Ground Planning Permission Expired
Land To The North Of Dairy House Farm Lightsource Renewable Energy 3.4 MW Ground Operational
Royals Wood Farm INRG Solar 5 MW Ground Abandoned
Bridgemere Garden Centre,London Road - Solar Panels Blue Diamond Limited 0.67 MW Roof Awaiting Construction
Hatherton Lodge Farm, Hunsterson Road - Solar Farm Noventum Power Limited 12.5 MW Ground Awaiting Construction
Smeaton Wood Farm, Pinsley Green Road - Solar Panels Smeaton Wood Farm Limited 0.18 MW Roof Awaiting Construction

Grid connection through SP Energy Networks / Electricity North West

SP Energy Networks / Electricity North West is the network operator here, and their answer on export capacity shapes the design. Any commercial array above 3.68 kW per phase connects under G99 rather than G98, and the application fixes what you are allowed to push back onto the network. If the local network is tight, limiting export rarely breaks the case here: most of the generation is consumed on site while the building is working.

Across Cheshire the planning database records 157 solar schemes totalling 582 MW, of which 13 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Nantwich

How much does a farm roof near Nantwich generate?
The model gives 840 kWh for every kWp installed here, so 500 kWp comes out at about 420,000 kWh a year before shading losses. A building of roughly 1,485 sqm of clear roof carries it. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Will the rural network around Nantwich take the export?
SP Energy Networks / Electricity North West is the distribution network operator for Cheshire. Anything above 3.68 kW per phase connects under G99, and the application sets the export limit. Rural supplies are often the binding constraint, so we ask the question before an array is sized.
Is planning permission needed for panels on a farm building near Nantwich?
Usually permitted development covers a roof array. Ground mounted arrays are a different question and are far more likely to need a full application. We put both to Cheshire East before design sign-off.
Has anyone near CW5 already done this?
The planning database records 4 ground mounted and 2 roof mounted solar schemes in this postcode district. That matters less as proof it works and more as evidence of how the local network has treated export applications. Roof arrays under a megawatt often never appear in the database, so the real figure is higher. Source: Renewable Energy Planning Database, Q1 2026.