farmsolarpanels Solar for farm buildings, UK wide Book a roof survey

Solar panels for farms in Thatcham

Most holdings around Thatcham already own the best generating site they will ever have, and it is the roof of the shed they built for something else. The survey starts on the covering: fibre cement or steel, its remaining life, the purlin spacing and what the frame will carry.

910 kWh per kWp a year at this latitude, so a 500 kWp array models at about 455,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Thatcham
96 m phase 1
Drawing Thatcham unit
Roof 96 x 62 m
Array 500 kWp
Yield 455,000 kWh/yr
Scale 1:500 / Rev A / RG19

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Thatcham / Berkshire
South East farmland with solar arrays on farm buildings
Industrial stock of the kind we survey across South East.

Solar for agricultural buildings across Berkshire

What a farm roof near Thatcham generates

Modelled irradiation at this latitude is 1168 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 910 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That sits within a few percent of the mean across the areas we cover, so what decides the scheme is your own demand pattern rather than the latitude.

The planning record lists 1 ground mounted solar scheme in this postcode district, which is a fair guide to how the local network has treated field arrays. The typical consented scheme in this district is about 1.5 MW. Source: Renewable Energy Planning Database, Q1 2026.

2 roof mounted schemes are on record nearby. Roof arrays under a megawatt frequently never reach that database at all, so the real number of farm roofs generating around Thatcham is higher than the record shows.

Surveys run across RG postcodes, RG19 outward.

West Berkshire is the planning authority for most holdings here, and it is the authority that decides whether an array on an agricultural building falls inside permitted development.

FIG. 1 What a Thatcham roof makes, month by month

What a Thatcham roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 26 kWh per kWpJanFeb: 39 kWh per kWpFebMar: 74 kWh per kWpMarApr: 106 kWh per kWpAprMay: 122 kWh per kWpMayJun: 125 kWh per kWpJun125 kWh Jul: 125 kWh per kWpJulAug: 106 kWh per kWpAugSep: 83 kWh per kWpSepOct: 51 kWh per kWpOctNov: 31 kWh per kWpNovDec: 21 kWh per kWpDec

Jun produces 6.0 times what Dec does on the same roof. A 500 kWp array here models at about 455,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2613,000
Feb3919,500
Mar7437,000
Apr10653,000
May12261,000
Jun12562,500
Jul12562,500
Aug10653,000
Sep8341,500
Oct5125,500
Nov3115,500
Dec2110,500
Source: EU PVGIS v5.2
FIG. 2 Thatcham against the rest of Berkshire
  • Thatcham910
  • Reading907
  • Maidenhead905
  • Newbury904
  • Slough903
  • Windsor901
  • Wokingham898
  • Bracknell891

Thatcham ranks 1 of 8 towns we cover in Berkshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 891 to 910, a spread of 19 kWh per kWp. Within Berkshire that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Solar already consented near RG19

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Limberlost Farm Anesco 1.5 MW Ground Operational
Harrods Distribution Centre, Mill Lane - Solar Array Private Developer 1.6 MW Roof Awaiting Construction
Kennet Secondary School, Stoney Lane - Solar Panels EEnergy Group plc 0.3 MW Roof Awaiting Construction

Grid connection through Scottish and Southern Electricity Networks

Scottish and Southern Electricity Networks is the network operator here, and their answer on export capacity shapes the design. Any commercial array above 3.68 kW per phase connects under G99 rather than G98, and the application fixes what you are allowed to push back onto the network. If the local network is tight, limiting export rarely breaks the case here: most of the generation is consumed on site while the building is working.

Across Berkshire the planning database records 83 solar schemes totalling 317 MW, of which 8 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Thatcham

Is there enough sun around Thatcham to make this work?
Modelled at 910 kWh per kWp a year for a shallow-pitched roof at this latitude, which puts a 500 kWp array at roughly 455,000 kWh a year before shading. That array needs about 1,485 sqm of clear roof once ridge vents and walkways are allowed for. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Who do we apply to for export near Thatcham?
Only Scottish and Southern Electricity Networks can answer it for your connection, and on rural feeders the answer varies farm to farm. An export-limited offer usually still works, because a holding with grain drying, cooling or ventilation uses most of what it makes.
Do we need planning permission in West Berkshire?
In most cases no, because panels on the roof of an agricultural building usually sit within permitted development. The exceptions are listed buildings, conservation areas, protected landscapes and arrays that stand proud of the roof. We check with West Berkshire either way.
Has anyone near RG19 already done this?
The planning database records 1 ground mounted and 2 roof mounted solar schemes in this postcode district. That matters less as proof it works and more as evidence of how the local network has treated export applications. Roof arrays under a megawatt often never appear in the database, so the real figure is higher. Source: Renewable Energy Planning Database, Q1 2026.

Nearby

All Berkshire locations